Skip to content

Hills Materials Maintenance Facility

Project Overview

When Hills Materials was in need of a space to service and maintain their fleet of equipment, they called upon Scull Construction to deliver. Within their requested six month time-frame, we were able to do just that. The 15,000 square foot facility contains office space, a mezzanine, work bays, wash area, and specialized work spaces. The shop has twelve overhead doors located on each side of the building for pull-through capability, and the large work bays give the mechanics room to work, while two 10-ton cranes do the heavy lifting.

Project Details

Architect

Upper Deck Architects

Project Manager

Danny Wegner

Owner

Hills Materials

Delivery Method

CMAR

Size

15,000 sf

Hills Materials Maintenance Facility

Project Overview

When Hills Materials was in need of a space to service and maintain their fleet of equipment, they called upon Scull Construction to deliver. Within their requested six month time-frame, we were able to do just that. The 15,000 square foot facility contains office space, a mezzanine, work bays, wash area, and specialized work spaces. The shop has twelve overhead doors located on each side of the building for pull-through capability, and the large work bays give the mechanics room to work, while two 10-ton cranes do the heavy lifting.

Project Details

Architect

Upper Deck Architects

Project Manager

Danny Wegner

Owner

Hills Materials

Delivery Method

CMAR

Size

15,000 sf