ImmutriX Office & Manufacturing Facility
ImmutriX and Intrinsic Materials have expanded their building to house their exciting biotech operations. The facility was built using pre-cast concrete panels and is modern, spacious, and functional. New lobby, front reception, office, and conference space are all built in the rustic-modern style. Large furnace, manufacturing floor, and storage spaces were added to increase output. An outdoor yard was added along with a 3,000 gallon gas tank for hydrogen storage.
Division Manager | Mike Charnholm |
---|---|
Superintendent | Dean Schmaltz |
Owner | ImmutriX |
Delivery Method | CMAR |
Size | 28,000 sf |