Skip to content

VRC Metal Systems Renovation

Project Overview

When the local school district moved the elementary school, VRC Metal Systems acquired the old school with a vision to turn it into an office and manufacturing facility. The heavy renovation completely updated the interior of the building and added key features to the exterior. Doors, floors, ceilings and window treatments were replaced. A loading dock was added and the water system upgraded. The sophisticated HVAC system conditions the building and controls air quality in key areas of the manufacturing process.

Project Details

Architect

 Fourfront Design

Division Manager

Mike Charnholm

Project Manager

John Neisner

Superintendent

Mike Walker

Owner

VRC Metal Systems

Delivery Method

CMAR

Size

50,000 sf

VRC Metal Systems Renovation

Project Overview

When the local school district moved the elementary school, VRC Metal Systems acquired the old school with a vision to turn it into an office and manufacturing facility. The heavy renovation completely updated the interior of the building and added key features to the exterior. Doors, floors, ceilings and window treatments were replaced. A loading dock was added and the water system upgraded. The sophisticated HVAC system conditions the building and controls air quality in key areas of the manufacturing process.

Project Details

Architect

 Fourfront Design

Division Manager

Mike Charnholm

Project Manager

John Neisner

Superintendent

Mike Walker

Owner

VRC Metal Systems

Delivery Method

CMAR

Size

50,000 sf