VRC Metal Systems Renovation
Project Overview
When the local school district moved the elementary school, VRC Metal Systems acquired the old school with a vision to turn it into an office and manufacturing facility. The heavy renovation completely updated the interior of the building and added key features to the exterior. Doors, floors, ceilings and window treatments were replaced. A loading dock was added and the water system upgraded. The sophisticated HVAC system conditions the building and controls air quality in key areas of the manufacturing process.
VRC Metal Systems Renovation
Project Overview
When the local school district moved the elementary school, VRC Metal Systems acquired the old school with a vision to turn it into an office and manufacturing facility. The heavy renovation completely updated the interior of the building and added key features to the exterior. Doors, floors, ceilings and window treatments were replaced. A loading dock was added and the water system upgraded. The sophisticated HVAC system conditions the building and controls air quality in key areas of the manufacturing process.
Project Details
Architect
Fourfront Design
Division Manager
Mike Charnholm
Project Manager
John Neisner
Superintendent
Mike Walker
Owner
VRC Metal Systems
Delivery Method
CMAR
Size
50,000 sf